Reference
ISO Needed Fire Flow (NFF) = Ci x Oi x (Xi + Pi)
Ci = Construction Factor = 18 x F x sqrt(Ae)
F: Class 1=1.5, Class 2=1.0, Class 3-4=0.8, Class 5-6=0.6
Ae = Effective Area = Floor Area x Stories
Oi = Occupancy Factor (0.75 to 1.25)
NFF rounded to nearest 250 gpm (min 500, max 12,000)
Duration: 2 hrs (<=2500 gpm), 3 hrs (<=3500), 4 hrs (>3500)
Minimum residual pressure: 20 psi