Input Parameters

Results

--
Total Evacuation Time
min
--
Stair Flow Rate
persons/min
--
Last Floor Clearance Time
min
--
Phased Evacuation Note
Note: Evacuation time estimate per SFPE Handbook methodology. Actual times vary with occupant demographics, pre-movement behavior, and stair congestion. IBC 403.5.1 requires fire command center for high-rise buildings. Consider elevator evacuation per IBC 403.6.2 and phased evacuation.

Reference

SFPE Handbook stair flow: ~18.5 persons/min/ft (free flow), ~15 persons/min/ft (crowded) Effective stair width = Clear width - 12 in (boundary layers) Stair descent speed: ~1.0 ft/s Pre-movement time: 3-6 min typical (office) IBC 403: High-rise = occupied floor >75 ft above lowest fire dept access Evac time = Pre-move + max(travel time, flow time)